Hatch prepared the basic design and definition designs for the project as well as the Owner’s technical requirements,
including drawings and specifications for civil structures, and mechanical and electrical systems.
More about Chacayes Hydroelectric Project >

The Karun III project, one of the largest in the world, includes a 205-m high double curvature arch dam, a two-bay service spillway, a large concrete-lined plunge pool, a 50-m-high mass concrete ogee tail pond dam and a 2000-MW underground powerhouse complex.
More about Karun III Hydroelectric Project >

The original Shikwamkwa Dam was constructed in 1958 as part of the Hollingsworth Generating Station project, near Wawa, Ontario. The dam was founded on permeable, highly variable, interbedded glaciofluvial and glaciolacustrine overburden deposits ranging from silts to boulders.
More about the Shikwamkwa Replacement Dam Project >

KGS Acres, a Hatch affiliated company, is providing engineering services for the design and construction of the 200-MW Wuskwatim hydroelectric development.
More about Wuskwatim Generating Station >

Hatch in association with Hatch Mott MacDonald is providing Owner’s Representative services to Ontario Power Generation for the construction of the $1.6-billion Niagara Tunnel facility project.
More about the Niagara Tunnel Project >